Saved versions
+852 67592810
JACK
DEVELOPER
Leung Man Hin
EXPERIENCE
FRONTEND DEVELOPER
Continuous Technologies International Ltd. (CTINT) | Mar 2025 - Present
React / TypeScript / Node / LLM Integration / CRM & Contact Center Solutions
Developing enterprise contact center solutions within CTINT's Customer Delight Solution Suite (CDSS), contributing to both core product features and client-specific customization projects.
PRODUCT DEVELOPMENT
  • AI Conversation Summarization (full-stack): Integrated an LLM to automatically transcribe and summarize completed voice and WhatsApp conversations into structured bullet-point records. Built the admin panel where each team configures its own summary prompt and output format with live preview, and surfaced the generated summary on the conversation detail page.
  • Text-to-Speech (TTS) portal: Built a portal where users upload text, select voice models, and generate and preview audio on demand using Microsoft (Azure) neural TTS, with version control for tracking and rollback of IVR voice content.
  • Email auto-reply module: Configuration module for creating and managing rule-based triggers and response templates.
CLIENT PROJECTS
  • BUPA Hong Kong: Developed a customer tagging management system enabling bulk import, binding, and administration of tags, surfaced to agents during inbound/outbound calls.
  • Shanghai Commercial Bank: Built a regulatory compliance audio system for Relationship Managers to deliver and record T&C acknowledgements during calls, with integrated playback controls and response logging.
  • HGC: Built a real-time operations wallboard giving managers live visibility into contact-center performance — agent availability, calls waiting, and queue wait times.
CO-FOUNDER
Buddy Ride Ltd. | Jan 2024 - Mar 2025
Next.js / React Native / Cloudflare Worker / Convex
Developed and launched a cross-border ride-sharing platform connecting passengers between Hong Kong and Macau, with a Next.js web platform, React Native mobile apps, and real-time backend operations on Cloudflare Workers and Convex.
KEY CONTRIBUTIONS
  • Platform Development: Built full-stack web and mobile apps with user authentication, ride matching, and real-time trip tracking for cross-border transportation.
  • System Architecture: Deployed scalable cloud infrastructure on Cloudflare Workers and Convex, designed to handle future growth in demand.
1/2
page
+852 67592810
JACK
Leung Man Hin
EXPERIENCE
CO-FOUNDER
Fractal Technologies Ltd. | Jan 2022 - Mar 2025
Yeslend Project
Next.js, Payload CMS, UI/UX Design
Designed the UI/UX and built the website for Yeslend, a financial services platform offering personal, mortgage, and business loans that integrates with multiple financial institutions to streamline loan applications.
KEY CONTRIBUTIONS
  • UI/UX Design: Created a user-friendly interface to improve customer engagement and simplify loan applications.
  • Website Development: Built the site with Next.js for a responsive, efficient experience.
  • CMS: Integrated Payload CMS for flexible, scalable content management.
Structural Design Project
Python / SAP2000
  • Designed structural solutions for antenna support on residential rooftops, using Python to automate SAP2000 model generation.
  • Prepared and conducted structural calculations in Excel, compiling comprehensive reports for submission to the Buildings Department.
ENGINEER III TO I
CM Wong & Associates Ltd. | Oct 2018 - Nov 2021
AutoCAD / SAP2000 / ETABS / SADS
KEY CONTRIBUTIONS
Residential Development at NKIL 6563, Kai Tak Area 1L, Site 2, Kowloon | Aug 2020 - Nov 2021
  • Designed two 39-storey towers and four 8-storey houses.
  • Developed ETABS, SAFE, and SADS models for superstructure, wind calculation, and RC (reinforced concrete) designs.
  • Assisted in daily project coordination with clients, architects, contractors, and other consultants.
Residential Development at NKIL 6554, Kai Tak Area 4A, Site 2, Kowloon | Mar 2021 - Nov 2021
  • Implemented ETABS, SAFE, and SADS models to design the superstructure, optimize transfer plates, and perform wind and RC analyses for four 30-storey high-rise towers and an 8-storey clubhouse.
2/2
page